on

December 03, 2015

  • 0

8 Rockwell

Bolstering a 75kWp solar grid-tied system at the top floor, 8 Rockwell in Makati City is one of the few urban high-rise projects in the Philippines to integrate photovoltaic (PV) panels to their roof space. The system is expected to yield 94,247kWh of power a year which is more than 1% of the building’s total annual energy requirements. Headed by Rockwell Land Corporation, the newly constructed office and leisure hub is actively pursuing green building recognition such as LEED certification with the help of renewable energy. 8 Rockwell’s system will be able to offset approximately 56,260 kg of CO2 emissions within a span of a year.

Location: Makati City

System Type:

Size: 75kWp

Modules: Canadian Solar CS6P

Inverter: Fronius Symo

Annual Yield: ~ 94,250kWh

Power Outage Protection:

Date Commissioned: