on

March 26, 2015

  • 0

PEDC

The solar modules that comprise the system are connected to three 3-phase inverters that will power up the administration building of PEDC in Iloilo City. In line with their campaign to propel pro-environmental programs while maintaining stable power supply, the system is designed to generate electricity for 70% of the entire building.

The initiative to invest in a solar power system is a pioneering step towards the campaign for cleaner and greener power technology, and a leap in the continued response to electric power shortage in the Visayas region.

Location: Iloilo City

System Type:

Size: 40.5kWp

Modules: Canadian Solar 250W

Inverter: SMA Sunny Tripower

Annual Yield: ~54,000kWh

Power Outage Protection:

Date Commissioned: