The project was awarded to Solenergy by GMCAC, an International consortium of GMR Group (developer and operator of airports worldwide) and Megawide Construction Corp. The system comprises 65 Fronius Symo 3-phase inverters, offering real-time online system monitoring and added safety functionality, such as arc and ground fault protection. The racking system was custom designed by Solenergy, with a cast in place ballast solution offering resistance to elevated wind speeds that are often experienced in the Visayas region. Solenergy also supplied a bespoke curtailment solution to enable the client to operate the PV system in parallel with their gensets, in case of brown out. In addition to such a notable solar power system, GMCAC also commissioned Solenergy to re-engineer the power room of Terminal 1. This included design, supply and installation of panelized switchgear and resin encased busduct system. The ability to offer advanced AC-side power solutions, further differentiated Solenergy from other suppliers. GMCAC demanded a full-service contractor for their ambitious new power plant and only Solenergy fit the bill.
- Location: Lapu Lapu City, Mactan, Cebu
- Size: 1.6 MW
- Inverter: Fronius Symo
- Annual Yield: 2,169,900 kWh