20MW Northern Luzon Project

20MW Northern Luzon Project

Project Framework & Scope Overview

Solenergy Systems Inc. was commissioned to do the front-end engineering and design as well as provide advisory services to a reputable developer for their 20 MWp Solar Facility in Central Luzon. Solenergy’s services include a comparative analysis and energy yield modeling for the power plant to be constructed.

Solenergy and the developer hopes to advance this project to construction by Q1 of 2021. This developer has an extensive track record and has a portfolio of several conventional and renewable energy power plants in operation. Solenergy was previously involved in building one of them as the local contractor.

More Engineering Services

Showing 6 projects
Century Pacific Food Inc.

Century Pacific Food Inc.

Location General Santos City
Globe Telecom Inc.

Globe Telecom Inc.

Location Quezon Province
System Size 0.0014 MWp
Japan Tobacco International

Japan Tobacco International

Location Batangas
System Size 4.77 MWp
PetroSolar (Phase 2)

PetroSolar (Phase 2)

Location Tarlac
System Size 20 MWp
SUMEC (Powersource First Bulacan Solar)

SUMEC (Powersource First Bulacan Solar)

Location Bulacan
System Size 81 MWp
Terasu

Terasu

Location Concepcion, Tarlac
System Size 60 MWp