To meet the increasing energy demand of operation requirements, Solenergy was commissioned to design, install, and maintain the first rooftop solar power system of Pioneer Hybrid Seeds, completed under a 20-year Power Purchase Agreement.
Thin-film modules connected to ten 3-phase inverters were installed at the production plant of the client in Tarlac City, which are expected to produce over 500kWh of energy every day. The project also includes a customized monitoring system to keep track of real-time system yield, developed by Solenergy.
- Location: Luisita, Tarlac
- Size: 140kWp
- Modules: DuPont Thin-Film
- Inverter: Fronius IG Plus
- Annual Yield: ~194,000kWh