Project Framework & Scope Overview

Solenergy Systems Inc. has been commissioned by the Developer as the local EPC partner for the project and has performed project construction during the course of development and implementation of the aforesaid 40MWAC (60MWp DC) solar PV project.

The developer, Terasu Energy Inc. (TEI), is a Special Purpose Vehicle (SPV) formed by Sindicatum Renewable Energy Holdings Philippines, Inc. (a subsidiary of SREC) in developing this 40MWAC (60WMpDC) Solar PV Plant near Concepcion, Philippines.

Sindicatum Renewable Energy Company Pte. Limited (SREC) develops, owns, invests, finances and operates renewable energy projects in target markets of South and South East Asia. The company has its headquarters in Singapore and has offices in Thailand, China, Indonesia, United Kingdom, India and Philippines.

More Utility Projects

Showing 7 projects
RASLAG Solar Plant Phase 4

RASLAG Solar Plant Phase 4

Location Magalang, Pampanga
System Size 36.54 MWp
FPSC Solar Power Plant

FPSC Solar Power Plant

Location Mabalacat, Pampanga
System Size 0.92 MWp
TPC Solar

TPC Solar

Location Mabalacat, Pampanga
System Size 20.89 MWp
RASLAG Solar Plant Phase 3

RASLAG Solar Plant Phase 3

Location Brgy. Bical, Mabalacat, Pampanga
System Size 18.01 MWp
Baras Solar Plant

Baras Solar Plant

Location Baras, Rizal
System Size 115 MWp
PetroSolar

PetroSolar

Location Tarlac City
System Size 20 MWp
RASLAG Solar Plant Phase 2

RASLAG Solar Plant Phase 2

Location Mexico, Pampanga
System Size 13.14 MWp