FPSC Solar Power Plant

FPSC Solar Power Plant

Project Framework & Scope Overview

Formosa Power Supply Corp (FPSC), in collaboration with EPC partner Solenergy Systems Inc, spearheaded the development of a 924KWp DC solar power project in Mabalacat, Pampanga. This initiative reflects FPSC’s commitment to sustainable energy solutions, with Solenergy Systems Inc contributing its expertise in engineering, procurement, and construction. The projected annual yield of 1314.97 megawatt-hours (MWh) underscores the anticipated efficiency of the solar power system in harnessing renewable energy. Notably, the project integrates advanced monitoring technology, leveraging Envision Monitoring to ensure precise supervision. The monitoring system is directly connected to the Distribution Utility (DU), enhancing real-time data accessibility and facilitating proactive management for optimal performance. This collaborative effort signifies a strategic alignment towards clean energy goals, combining FPSC’s vision with Solenergy Systems Inc’s technical proficiency and cutting-edge monitoring solutions.

More Utility Projects

Showing 7 projects
RASLAG Solar Plant Phase 4

RASLAG Solar Plant Phase 4

Location Magalang, Pampanga
System Size 36.64 MW
TPC Solar

TPC Solar

Location Mabalacat, Pampanga
System Size 20.89MW DC
RASLAG Solar Plant Phase 3

RASLAG Solar Plant Phase 3

Location Brgy. Bical, Mabalacat, Pampanga
System Size 18.25 MWp DC / 13.56 MW AC
Baras Solar Plant

Baras Solar Plant

Location Baras, Rizal
System Size 115 MW
Terasu

Terasu

Location Concepcion, Tarlac
System Size 60 MWp
PetroSolar

PetroSolar

Location Tarlac City
System Size 20 MW
RASLAG Solar Plant Phase 2

RASLAG Solar Plant Phase 2

Location Mexico, Pampanga
System Size 13.14 MW