Terasu

Terasu

Project Framework & Scope Overview

Solenergy Systems Inc. provided the client with technical assistance in the form of front-end engineering and design (FEED), supported their commercial justification, and provided necessary documentation for statutory submissions to government and regulatory bodies during the project development phase. This enabled the developer to bring the project to the construction and tendering phase where Solenergy also put out the most competitive bid and was awarded the project. The project has been energized since Q2 of 2021.


Solenergy Systems Inc. continues to support the developer in their two other projects, which include Energy Yield Analysis, Front End Engineering and Design, and Document Generation for Submission to different stakeholders.

More Engineering Services

Showing 6 projects
Century Pacific Food Inc.

Century Pacific Food Inc.

Location General Santos City
Globe Telecom Inc.

Globe Telecom Inc.

Location Quezon Province
System Size 0.0014 MWp
20MW Northern Luzon Project

20MW Northern Luzon Project

Location Pampanga
System Size 20 MWp
Japan Tobacco International

Japan Tobacco International

Location Batangas
System Size 4.77 MWp
PetroSolar (Phase 2)

PetroSolar (Phase 2)

Location Tarlac
System Size 20 MWp
SUMEC (Powersource First Bulacan Solar)

SUMEC (Powersource First Bulacan Solar)

Location Bulacan
System Size 81 MWp